DESCRIPTION OF WORK: All work for the Project shall be constructed in accordance with the Specifications prepared by the Engineer. Unit Cost Bids shall be submitted for furnishing, delivering and installing all materials, equipment and services, including labor for the Work, which generally involves the following activities:

For the Crystal River Stormwater Drainage Clearing Areas Project, the work involves clearing an identified series of canals of debris and trash, to be graded and sodded, to have trees, log, roots, and shrubs removed, to dewater and demuck where applicable, to remove unsuitable material where applicable, and to haul the removed material. 

Drainage Clearing Areas are identified in Section 900.